The history of the wind farm:
The first met mast was erected on 2 July 1997. Encouraged by the first promising measurements, the realisation of the project began in 1998. There are three wind turbines in Oberrödham and two in Steindlberg.
Managing Director: Anton Haunold, 4755 Zell/Pram (07764/ 20140)
Technical data:

Type: Vestas V 47-660/200kW
Nominal power: 600 kW
Rotor diameter: 47 m
Rotor area: 1,735 m²
Switch-on speed: 3.5 m/sec
Nominal speed: 16 m/sec, switch-off speed: 25 m/sec

Environmental balance:

Annual yield in kWh: 3.177.748
Electricity for households: 1510
Savings in litres of oil/year: 1,800,000
CO2 reduction tonnes/year: 4541



Travelling by public transport
Route planner for independent travellers

Please get in touch for more information.

Contact


Windpark Oberrödham und Steindlberg
Rödham 14
4721 Altschwendt

We speak the following languages

German

powered by TOURDATA